Concrete Floor Moisture Testing Workflow
Standard procedure for testing concrete moisture levels before coating or polishing. Covers calcium chloride test, RH probe method, and pass/fail criteria.
Steps
- 1
Visual Inspection
Check for visible moisture, efflorescence (white salt deposits), or dark wet spots. Note any standing water or recent rain exposure.
Pro tip: Morning inspections catch moisture that evaporates by afternoon. Test early.
- 2
Plastic Sheet Test (Quick)
Tape 18x18 inch plastic sheet to floor. Wait 24-72 hours. Check for condensation under plastic or darkening of concrete.
Pass: No moisture visible\nFail: Any condensation or darkening\nNote: This is screening only, not definitive
- 3
Calcium Chloride Test (ASTM F1869)
Place calcium chloride dish on clean concrete under sealed dome. Wait 60-72 hours. Weigh dish to calculate moisture vapor emission rate (MVER).
Pass: < 3 lbs/1000sqft/24hr for most coatings\nPass: < 5 lbs for moisture-tolerant systems\nFail: > 5 lbs — do not coat
- 4
RH Probe Test (ASTM F2170)
Drill hole to 40% of slab depth. Insert RH probe. Wait 72 hours for equilibrium. Read relative humidity.
Pass: < 75% RH for most epoxies\nPass: < 80% RH for moisture-mitigating primers\nFail: > 80% RH — moisture barrier required
- 5
Document and Decide
Record all readings with location map. If pass: proceed with grinding/coating. If fail: recommend moisture mitigation system or wait for slab to dry.
Tools Required
Estimated Monthly Cost
Testing supplies only
Download This Workflow
Enter your email to get the n8n-compatible JSON file. One-time unlock for all workflows.
Need This Workflow Customized?
We can match this automation to your specific equipment and process.
Get a Quote